Place mouse over any image to pause the slideshow.
Step 1
Take the pre assembled top of the bar cart as shown and flip it over.
Step 2
Add 4 12" pipes to the couplings as shown
Step 3
Loosely add the four flanges to the top but do not tighten as they need to be turned to match the screw holes for the next tier.
Step 4
Step 5
Step 6
Add 4 12" pipes to the fittings. Then loosely add 4 more flanges again and do not tighten so you can align them in the final step.
Step 7
Step 8
Step 9 - Flip it over and admire your work 🙂
Thanks from Lew - Pipeworkpieces